• We used steel imported from Sweeden and Japan.
• With the mold is given a certificate of the quality of the steel.
• The certificate and the guarantee are backed by our office in USA.
• Use of high precision CNC machines.
• Use of CAD/CAM design, engineering and manufacturing.
• Professional design of the mold structure (2D and 3D).
• Professional design of the finished product (3D).
• Use of specialized software for analyzinf material flow.
• Bi-weekly progress report.
• Schedule of activities and manufacturing.
• Video of when the mold is tested.
• All drawings are shipped together with the mold.
• Lot of spare parts for free.